New FCP Industrial Mezzanines Project
September 5, 2023
FCP Project Gallery
America’s Best Built Steel Structures
New FCP Industrial Mezzanines Project
Custom Industrial Mezzanine Project for South King Fire & Rescue
Recently, FCP was commissioned to develop a custom industrial mezzanine for DACO, with the end user being South King Fire & Rescue. The challenge at hand was to increase floor space to enhance storage capacity and organization. This would streamline the picking process during emergencies and promote a safer work environment by reducing clutter.
FCP’s solution was the Free-Space Mezzanine™ featuring Connect-Rite™ system, an AISI bi-directional unique bolt-together rigid-frame system. Unlike other mezzanines, this mezzanine did not require bracing, resulting in a more open appearance and minimal interference with forklift traffic. The all-galvanized framing and steel decking enhance visibility by reflecting light below the platform.
The client noted that compared to a similar structure installed by a different company at another location, FCP’s product was much more robust, better constructed, and aesthetically pleasing. The success of this project, combined with strong communication from DACO and the quality product provided by FCP, has paved the way for future collaborations with the city of Federal Way.
Additionally, the platform has been designed for future expansion, ensuring that South King Fire & Rescue can adapt to increasing space requirements as needed.
Click to Enlarge
Looking to get a quote on an Industrial Mezzanine?
About FCP, Inc.
FCP Inc. has been a leader in the design, engineering, development, and construction of high-quality modular steel structures for over 40 years. FCP in-house system designers and engineers take great pride in utilizing the latest CAD equipment to devise creative solutions that meet challenging applications. For more information contact FCP Inc.
PROJECT DETAILS
INDUSTRY | Emergency Response |
CATEGORY | Mezzanines |
SYSTEM | FCP Connect-Rite™ |
MATERIAL | Aluminum |
CLIENT | DACO |
END USER | South King Fire & Rescue |
SPECIFICATIONS
- Custom Engineering Per Clients Requirements – Aluminum Platform, Guard Rails, Staircase, and Stair Landing
- FCP’s Connect-Rite™ Design – AISI Bi-Directional Bolted Moment Frame – IBC Code Compliant
- FCP Stamped Drawings/Calcs Provided
New FCP Industrial Mezzanines Project
Custom Industrial Mezzanine Project for South King Fire & Rescue
Recently, FCP was commissioned to develop a custom industrial mezzanine for DACO, with the end user being South King Fire & Rescue. The challenge at hand was to increase floor space to enhance storage capacity and organization. This would streamline the picking process during emergencies and promote a safer work environment by reducing clutter.
FCP’s solution was the Connect-Rite™ system, an AISI bi-directional unique bolt-together rigid-frame system. Unlike other mezzanines, this mezzanine did not require bracing, resulting in a more open appearance and minimal interference with forklift traffic. The all-galvanized framing and steel decking enhance visibility by reflecting light below the platform.
The client noted that compared to a similar structure installed by a different company at another location, FCP’s product was much more robust, better constructed, and aesthetically pleasing. The success of this project, combined with strong communication from DACO and the quality product provided by FCP, has paved the way for future collaborations with the city of Federal Way.
Additionally, the platform has been designed for future expansion, ensuring that South King Fire & Rescue can adapt to increasing space requirements as needed.
Click to Enlarge
Looking to get a quote on an Industrial Mezzanine?
About FCP, Inc.
FCP Inc. has been a leader in the design, engineering, development, and construction of high-quality modular steel structures for over 40 years. FCP in-house system designers and engineers take great pride in utilizing the latest CAD equipment to devise creative solutions that meet challenging applications. For more information contact FCP Inc.
PROJECT DETAILS
INDUSTRY | First Response |
CATEGORY | Mezzanines |
SYSTEM | FCP Connect-Rite™ |
MATERIAL | Aluminum |
CLIENT | DACO |
END USER | South King Fire & Rescue |
SPECIFICATIONS
- Custom Engineering Per Clients Requirements – Aluminum Platform, Guard Rails, Staircase, and Stair Landing
- FCP’s Connect-Rite™ Design – AISI Bi-Directional Bolted Moment Frame – IBC 2019 Code Compliant
- FCP Stamped Drawings/Calcs Provided